The Seattle Times Store | Art & Photo Prints

Show Navigation
  • GALLERIES
  • SEARCH
  • CUSTOM REQUESTS
  • CONTACT
  • ABOUT
  • MY ACCOUNT
  • SHOPPING CART
  • Back to Seattle Times Store

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 5 images found }

Loading ()...

  • After being trapped underground and broken, a cutting head assembly is finally brought to the surface for repairs, temporarily stopping some workers in their tracks.<br />
<br />
Ken Lambert / The Seattle Times
    Bertha Surfaces
  • Workers stand on top of the tunnel-boring machine Bertha, looking down at the ring-shaped cutter drive and bearing that has been exposed to be lifted out and repaired.<br />
<br />
Steve Ringman / The Seattle Times
    145437_bertha_02.JPG
  • John Grade works inside his sculpture, "Wawona," as it takes shape in MOHAI's new South Lake Union building.   Floor-to-ceiling scaffolding gives workers access to the entire height of the piece as it's assembled.  Only the old growth Douglas fir from below the water line could be salvaged from the sailing ship Wawona.  The platform that Grade stands on is lowered by chains as the piece is assembled.<br />
Alan Berner / The Seattle Times
    Wawona Scaffolding MOHAI
  • An Iron worker climbs the outside steel beam at the very top of the AT&T Gateway Tower. The 62-story view behind him looks North with downtown Seattle in the foreground. (Greg Gilbert / The Seattle Times, 1989)
    Guy in the sky
  • A worker walks beneath the hull of the Chimacum, the newest state ferry, under final assembly at Vigor Shipyard in Seattle. (Mike Siegel / The Seattle Times)
    A ferry’s journey toward completion
  • Facebook
  • Twitter
x