The Seattle Times Store | Art & Photo Prints

Show Navigation
  • GALLERIES
  • SEARCH
  • CUSTOM REQUESTS
  • CONTACT
  • ABOUT
  • MY ACCOUNT
  • SHOPPING CART
  • Back to Seattle Times Store
back to search results
Prev Next
Info
  • Facebook
  • Twitter
x

Lining up Engine No. 3

Jeff Miller, who helps oversee functional tests of the 747 engine and landing gear, lines up engine No. 3 with the mount on the final new 747 as he slowly drives it into place under the giant wing. (Jennifer Buchanan / The Seattle Times)

Add to Cart
Filename
Lining up Engine No. 3
Copyright
The Seattle Times
Image Size
4537x2925 / 8.2MB
Boeing 747 Jumbo Jet Boeing Everett Factory final 747 airplane aerospace manufacturing aviation airplane manufacturing international travel Everett 1 574 Queen of the Skies assembly plant 1960s Joe Sutter chief engineer four-engines jetliner The Incredibles widebody jetliner air travel
Contained in galleries
The Last 747
Jeff Miller, who helps oversee functional tests of the 747 engine and landing gear, lines up engine No. 3 with the mount on the final new 747 as he slowly drives it into place under the giant wing.  (Jennifer Buchanan / The Seattle Times)